# How Landry/French Construction uses Brex

**20 hours to 3** Month-end close time

As published on [brex.com](https://www.brex.com/resources/customer/landry-french), March 2026. Captured by usedby on 2026-11-21.

- Company: [Landry/French Construction](https://www.usedby.ai/companies/landry-french-construction.md)
- Tool: [Brex](https://www.usedby.ai/tools/brex.md)
- Teams: Finance, Accounting

## The use case: how Landry/French Construction deploys Brex

Landry/French Construction replaced four separate card programs (including Ramp) with a single Brex card for field crews. Transactions are coded with general ledger accounts, cost codes and budgets in Brex and exported through standardized reports into the company's ERP.

Summary written by usedby from the source page, in English. The figures are those of Brex and Landry/French Construction, not ours.

> What previously took 16 to 20 hours every month end now takes approximately 3 to 4 hours total.

- **85%**: “The 85% reduction in reconciliation time freed the finance team to focus on strategic work instead of administrative data entry.”
- **$20,000**: “By consolidating all spend onto Brex, the company now earns rewards across the board — resulting in more than $20,000 in rewards, “easily 50% more than what I would have earned had with Ramp”, says Shannon.”

> Transitioning to Brex from Ramp reduced our month-end close from 20 hours to just 3. And throughout the whole process the Brex team has simply been top notch.
>
> Shannon Hall, CFO

Source: [brex.com](https://www.brex.com/resources/customer/landry-french), captured 2026-11-21.

## Other companies using Brex

- [Attivo Partners](https://www.usedby.ai/companies/attivo-partners.md) — Confirmed
- [Canva](https://www.usedby.ai/companies/canva.md) — Confirmed
- [Doordash](https://www.usedby.ai/companies/doordash.md) — Confirmed
- [Hatchproof](https://www.usedby.ai/companies/hatchproof.md) — Confirmed
- [Lemonade](https://www.usedby.ai/companies/lemonade.md) — Confirmed
- [ONEflight International](https://www.usedby.ai/companies/oneflight-international.md) — Confirmed

## What usedby checked

We compared the story with its live page on 2026-11-21.

- Checked: the figure 20 hours to 3 is on the page; its label is our wording.
- Checked: the passage quoted above is copied word for word from the page, near the name of Landry/French Construction.
- Checked: the publication date is read from the page’s own metadata, never guessed.
- Checked: Landry/French Construction uses Brex. Confirmed line. Latest check across sources: 2026-11-21.
- Not checked: the result itself. We quote it; we did not measure it.

---
Source: https://www.usedby.ai/case-studies/landry-french-construction-brex · How we check: https://www.usedby.ai/methodology
