# How Multiplex uses Buildots

As published on [buildots.com](https://buildots.com/case-studies/multiplex-partners-with-buildots/), March 2026. Captured by usedby on 2026-10-07.

- Company: [Multiplex](https://www.usedby.ai/companies/multiplex.md)
- Tool: [Buildots](https://www.usedby.ai/tools/buildots.md)
- Teams: BIM teams, Project teams, Trade management

## What the story says

Multiplex uses Buildots on the One Leadenhall high-rise project in London to track subcontractor progress against the planned schedule, flag at-risk activities and unfinished work, and base weekly trade coordination on objective site data instead of manual reporting.

Summary written by usedby from the source page, in English. The figures are those of Buildots and Multiplex, not ours.

> Buildots enabled Multiplex to proactively manage site performance using real-time, AI-driven insights:

> Buildots has enabled us to base trade collaboration on objective data. This has resulted in a proactive approach in identifying activities at risk of delay to enable efficient plans and solutions to be implemented.
>
> Andrew Feighery, Project Director

## What usedby checked

We compared the story with its live page on 2026-10-07.

- Checked: the passage quoted above is copied word for word from the page, near the name of Multiplex.
- Checked: the publication date is read from the page’s own metadata, never guessed.
- Checked: Multiplex uses Buildots. Confirmed line. Latest check across sources: 2026-10-07.
- Not checked: the result itself. We quote it; we did not measure it.

---
Source: https://www.usedby.ai/case-studies/multiplex-buildots · How we check: https://www.usedby.ai/methodology
