# How OMV uses Cognite

**50%**: “50% reduction in inspection planning time”

As published on [cognite.com](https://www.cognite.com/en/customers/omv). Captured by usedby on 2026-10-08.

- Company: [OMV](https://www.usedby.ai/companies/omv.md)
- Tool: [Cognite](https://www.usedby.ai/tools/cognite.md)
- Teams: production engineers

## What the story says

OMV uses Cognite Data Fusion as its foundational data platform to combine data from multiple systems, giving production engineers a way to monitor well operating envelopes and automate workflows. It supports inspection planning, production optimization and digital transformation across the value chain.

Summary written by usedby from the source page, in English. The figures are those of Cognite and OMV, not ours.

> OMV used Cognite Data Fusion®, to combine data from six different systems, giving production engineers a simple, efficient way of monitoring well operating envelopes:

- **6%**: “6% deferment savings on production”
- **35 days per year**: “Extends the life of gas fields by 35 days per year”
- **5 hours**: “5 hours saved per week”

> Cognite Data Fusion® is an integrated part of our enterprise architecture and is the best platform to consolidate and liberate data for our surface data domains.
>
> Markus Berghofer, SVP for IT and Digital, OMV Energy

## What usedby checked

We compared the story with its live page on 2026-10-08.

- Checked: the figure 50% is printed word for word on the page, near the name of OMV.
- Checked: the passage quoted above is copied word for word from the page, near the name of OMV.
- Checked: OMV uses Cognite. Confirmed line. Latest check across sources: 2026-10-08.
- Not checked: the result itself. We quote it; we did not measure it.

---
Source: https://www.usedby.ai/case-studies/omv-cognite · How we check: https://www.usedby.ai/methodology
