Qué pasó

Multiplex uses Buildots on the One Leadenhall high-rise project in London to track subcontractor progress against the planned schedule, flag at-risk activities and unfinished work, and base weekly trade coordination on objective site data instead of manual reporting.

Resumen escrito por usedby a partir de la página de origen, en inglés. Las cifras son de Buildots y de Multiplex, no nuestras.

Buildots enabled Multiplex to proactively manage site performance using real-time, AI-driven insights:

De la página. buildots.com, capturada el 7 oct 2026

Buildots has enabled us to base trade collaboration on objective data. This has resulted in a proactive approach in identifying activities at risk of delay to enable efficient plans and solutions to be implemented.

Andrew Feighery, Project Director, Multiplex. Fuente, capturada el 7 oct 2026

Lo que dice la historia, y lo que verificamos

Comparamos la historia con su página en línea el 7 oct 2026.

  • El pasaje citado arribaVerificadoCopiado palabra por palabra de la página, cerca del nombre de Multiplex.
  • La fecha de publicaciónVerificadoLeída en los metadatos de la propia página, nunca adivinada.
  • Multiplex usa BuildotsVerificadoLínea de nivel Confirmado. Última verificación entre todas las fuentes: 7 oct 2026.
  • El resultado en síNo verificadoLo citamos; no lo medimos.

Misma empresa, misma herramienta o mismo sector.

260,000 sqm“covering more than 260,000 sqm (2.8M sqft) of construction”Sir Robert McAlpine usa Buildots. Otro cliente de Buildots70%“70% reduction in manual reporting.”NCC usa Buildots. Otro cliente de Buildots9 weeks“finishing 9 weeks ahead of schedule on a 65 week program”EcoWorld usa Buildots. Otro cliente de Buildots