50%
“50% reduction in inspection planning time”
Tal como se publicó en cognite.com. Capturado por usedby el 8 oct 2026.
Qué pasó
OMV uses Cognite Data Fusion as its foundational data platform to combine data from multiple systems, giving production engineers a way to monitor well operating envelopes and automate workflows. It supports inspection planning, production optimization and digital transformation across the value chain.
Resumen escrito por usedby a partir de la página de origen, en inglés. Las cifras son de Cognite y de OMV, no nuestras.
- 6%“6% deferment savings on production”
- 35 days per year“Extends the life of gas fields by 35 days per year”
- 5 hours“5 hours saved per week”
OMV used Cognite Data Fusion®, to combine data from six different systems, giving production engineers a simple, efficient way of monitoring well operating envelopes:
Cognite Data Fusion® is an integrated part of our enterprise architecture and is the best platform to consolidate and liberate data for our surface data domains.
Lo que dice la historia, y lo que verificamos
Comparamos la historia con su página en línea el 8 oct 2026.
- La cifra: 50%VerificadoImpresa palabra por palabra en la página, cerca del nombre de OMV.
- El pasaje citado arribaVerificadoCopiado palabra por palabra de la página, cerca del nombre de OMV.
- OMV usa CogniteVerificadoLínea de nivel Confirmado. Última verificación entre todas las fuentes: 8 oct 2026.
- El resultado en síNo verificadoLo citamos; no lo medimos.