Ir al contenido principal
usedby

8 days

“8 days earlier close moved from the 14th to the 5th”

Tal como se publicó en ramp.com. Capturado por usedby el 7 oct 2026.

Qué pasó

The Second City uses Ramp corporate cards, expense management and Bill Pay to replace a manual receipt-attachment process and a non-functional AP automation tool. Ramp's OCR and automated coding handle line items and project codes across its multiple legal entities, locations and shows.

Resumen escrito por usedby a partir de la página de origen, en inglés. Las cifras son de Ramp y de The Second City, no nuestras.

  • $40k“$40k saved annually by consolidating systems”
  • 2x faster“2x faster bill processing time”
  • 90%“Now, about 90% of The Second City's spend goes through Ramp”

Ramp has accelerated the close process, and the sooner I can close the month, the faster I can move on to all the additional reporting demands that come from ownership," says Frank. "We were able to start our budgeting process a month earlier this year than last year.

De la página. ramp.com, capturada el 7 oct 2026

Switching to Ramp for Bill Pay saved us not only time but also a significant amount of money. Our previous AP automation tool cost us around $40,000 per year, and it wasn't even working properly. Ramp is far more functional, and we're getting the benefits at a fraction of the cost.

Frank Byers, Controller, The Second City, The Second City. Fuente, capturada el 7 oct 2026

Lo que dice la historia, y lo que verificamos

Comparamos la historia con su página en línea el 7 oct 2026.

  • La cifra: 8 daysVerificadoImpresa palabra por palabra en la página, cerca del nombre de The Second City.
  • El pasaje citado arribaVerificadoCopiado palabra por palabra de la página, cerca del nombre de The Second City.
  • The Second City usa RampVerificadoLínea de nivel Confirmado. Última verificación entre todas las fuentes: 7 oct 2026.
  • El resultado en síNo verificadoLo citamos; no lo medimos.

Misma empresa, misma herramienta o mismo sector.

one to two days“What used to take two months now takes one to two days.”ABB Optical usa Ramp. Otro cliente de Ramp26 hours“an average of 26 hours of procurement work every month that gets automated”Browserbase usa Ramp. Otro cliente de Ramp100 staff hours a month“Across City Hall, over 100 staff hours a month were reclaimed.”City of Ketchum usa Ramp. Otro cliente de Ramp