50%
“50% reduction in inspection planning time”
Tel que publié sur cognite.com. Capturé par usedby le 8 oct. 2026.
Ce qui s’est passé
OMV uses Cognite Data Fusion as its foundational data platform to combine data from multiple systems, giving production engineers a way to monitor well operating envelopes and automate workflows. It supports inspection planning, production optimization and digital transformation across the value chain.
Résumé rédigé par usedby à partir de la page source, en anglais. Les chiffres sont ceux de Cognite et de OMV, pas les nôtres.
- 6%“6% deferment savings on production”
- 35 days per year“Extends the life of gas fields by 35 days per year”
- 5 hours“5 hours saved per week”
OMV used Cognite Data Fusion®, to combine data from six different systems, giving production engineers a simple, efficient way of monitoring well operating envelopes:
Cognite Data Fusion® is an integrated part of our enterprise architecture and is the best platform to consolidate and liberate data for our surface data domains.
Ce que dit le témoignage, et ce que nous avons vérifié
Nous avons comparé le témoignage à sa page en ligne le 8 oct. 2026.
- Le chiffre : 50%VérifiéImprimé mot pour mot sur la page, près du nom de OMV.
- L’extrait cité plus hautVérifiéCopié mot pour mot depuis la page, près du nom de OMV.
- OMV utilise CogniteVérifiéLigne de niveau Confirmé. Dernière vérification, toutes sources confondues : 8 oct. 2026.
- Le résultat lui-mêmeNon vérifiéNous le citons ; nous ne l’avons pas mesuré.