92%
“reducing its production planning time from two days to just four hours—a 92% reduction”
Tel que publié sur retool.com. Capturé par usedby le 2 oct. 2026.
Ce qui s’est passé
Zeus, a manufacturer of advanced polymer components, uses Retool apps and workflows to replace spreadsheets and SharePoint lists with connected internal tools. These include a real-time production scheduling system that draws on its ERP, data lakehouse and SQL databases.
Résumé rédigé par usedby à partir de la page source, en anglais. Les chiffres sont ceux de Retool et de Zeus, pas les nôtres.
- 15%“The real-time scheduling system improved on-time delivery by 15%”
- 85%“85% reduction in development time (from 2 weeks to 2 days)”
- $83,200“One application alone saved the team approximately $83,200 annually in data wrangling costs.”
- 1,000+“1,000+ weekly active users within three months”
They created a real-time production scheduling system that integrated machine capacity data across facilities, using priority-based algorithms to calculate accurate delivery dates based on equipment availability and order urgency.
We've transformed a nearly impossible manual process that would have taken weeks of collaboration into a streamlined solution that our sales team can easily use. What used to take a week now takes an hour for our sales team. For our customers, that's huge; they don't want to wait.
Ce que dit le témoignage, et ce que nous avons vérifié
Nous avons comparé le témoignage à sa page en ligne le 3 oct. 2026.
- Le chiffre : 92%VérifiéImprimé mot pour mot sur la page, près du nom de Zeus.
- L’extrait cité plus hautVérifiéCopié mot pour mot depuis la page, près du nom de Zeus.
- Zeus utilise RetoolVérifiéLigne de niveau Confirmé. Dernière vérification, toutes sources confondues : 8 oct. 2026.
- Le résultat lui-mêmeNon vérifiéNous le citons ; nous ne l’avons pas mesuré.




