Momentic
Preuve client
Aucun exemple d’entreprise vérifié pour ce processus.
Ce que dit la documentation
Mise en œuvre documentée
Pocus runs end-to-end checks before production deployments.
Configuration et limites: The case leaves checkout and payment checks unspecified.
Best Parents uses Momentic for testing a marketplace with complex checkout flows.
Configuration et limites: The case leaves the checkout assertion and staging CI gate unspecified.
Environnement de préproduction
Select staging in the CLI configuration or supply a preview URL override.
Configuration et limites: A hardcoded test URL takes priority over the selected environment.
Validation du déploiement dans la CI
A counted failure or timeout exits with status 1.
Configuration et limites: Enable failure handling for a quarantined checkout test before making it a release gate.
Contrôles du parcours de paiement
Assert the exact order confirmation or total from rendered content.
Configuration et limites: The text assertion does not read an input’s current value.
Résultats et pièces de test
Publish a CI report and inspect step screenshots or traces in the dashboard.
Configuration et limites: Dashboard details depend on uploading results.
Offres et usage
Free and Scale include monthly usage budgets.
Configuration et limites: Tests stop running when the balance runs out.