20%
“Days to close have already been reduced by 20%”
Tel que publié sur floqast.com. Capturé par usedby le 8 oct. 2026.
Ce qui s’est passé
Verint uses FloQast, integrated with Oracle NetSuite, to manage its month-end financial close. It replaced shared spreadsheets and manual checklists with centralized documentation, real-time status dashboards and checklists, and standardized close controls across its global offices.
Résumé rédigé par usedby à partir de la page source, en anglais. Les chiffres sont ceux de FloQast et de Verint, pas les nôtres.
As for sheer time savings on closing days, the numbers are clear in that area. Days to close have already been reduced by 20% and will likely be reduced even further.
What once was a longer close cycle will now be reduced by 20%. We will achieve a close cycle that is better than the industry average.
Ce que dit le témoignage, et ce que nous avons vérifié
Nous avons comparé le témoignage à sa page en ligne le 8 oct. 2026.
- Le chiffre : 20%VérifiéImprimé mot pour mot sur la page, près du nom de Verint.
- L’extrait cité plus hautVérifiéCopié mot pour mot depuis la page, près du nom de Verint.
- Verint utilise FloQastVérifiéLigne de niveau Confirmé. Dernière vérification, toutes sources confondues : 8 oct. 2026.
- Le résultat lui-mêmeNon vérifiéNous le citons ; nous ne l’avons pas mesuré.




