Pular para o conteúdo principal
usedby
MultiplexcomBuildots

Como Multiplex usa Buildots

ConfirmadoEstudo de caso do fornecedor · Verificado em 7 de out. de 2026
Ver a prova capturada

O caso de uso: como Multiplex implanta Buildots

Multiplex uses Buildots on the One Leadenhall high-rise project in London to track subcontractor progress against the planned schedule, flag at-risk activities and unfinished work, and base weekly trade coordination on objective site data instead of manual reporting.

Nas palavras do cliente

Buildots has enabled us to base trade collaboration on objective data. This has resulted in a proactive approach in identifying activities at risk of delay to enable efficient plans and solutions to be implemented.
Andrew Feighery, Project Director, Multiplex — Fonte

Usuários de Buildots no setor Construção

Empresas do mesmo setor, com evidências públicas.

JE DunnConfirmadoNCCConfirmadoSir Robert McAlpineConfirmadoWatesConfirmadoAarsleffObservadoJoerisObservado
Ver todos os clientes de Buildots

Mais estudos de caso

Ir direto à fonte

Com base no estudo de caso publicado por Buildots. Verificamos as evidências públicas; os resultados são informados pelo fornecedor.

buildots.com
Fonte publicada em
13 de mar. de 2026
Última verificação
7 de out. de 2026
buildots.comEstudo de caso de Buildots sobre Multiplex, capturadoAbrir a captura da fonte
O que o estudo de caso afirma e o que verificamos

O que comparamos com a página.

  • O trecho citado acimaVerificado

    Copiado palavra por palavra da página, perto do nome de Multiplex.

  • A data de publicaçãoVerificado

    Lida nos próprios metadados da página, nunca adivinhada.

  • Multiplex usa BuildotsVerificado

    Linha de nível Confirmado.

  • O resultado em siNão verificado

    Nós o citamos; não o medimos.

Buildots enabled Multiplex to proactively manage site performance using real-time, AI-driven insights:
Trecho da página. buildots.com