70%
“70% reduction in manual reporting.”
As published on buildots.com, March 2026. Captured by usedby on Oct 7, 2026.
What happened
NCC uses Buildots AI-powered progress tracking on construction projects, including a residential project in Helsinki, a hospital campus and a commercial development, to measure actual site progress instead of relying on manually collected assessments. It uses the data for trade management, planning and reducing manual reporting.
Summary written by usedby from the source page, in English. The figures are those of Buildots and NCC, not ours.
- x2.3“x2.3 more tasks completed on time, measured via the Percent Plan Complete metric.”
- 68,500 sqm“In total, this brought the tracked area to 68,500 sqm.”
Using Buildots, NCC saved time and saw huge improvements in project performance:
With Buildots, I can verify completed works and see if something is done or not. I don’t have to run to the site every time. Plus, I’m able to understand how fast we advance each week and monitor the pace, output, and performance of my trades.
We spend less time running around the site, less time in meetings, less time arguing with subs, and more time actually fixing things.
What the story claims, and what we checked
We compared the story with its live page on Oct 7, 2026.
- The figure: 70%CheckedPrinted word for word on the page, near the name of NCC.
- The passage quoted aboveCheckedCopied word for word from the page, near the name of NCC.
- The publication dateCheckedRead from the page’s own metadata, never guessed.
- NCC uses BuildotsCheckedConfirmed line. Latest check across sources: Oct 7, 2026.
- The result itselfNot checkedWe quote it; we did not measure it.




