The use case: how Valley Interior Systems deploys OpenSpace
Valley Interior Systems uses OpenSpace to document jobsite conditions through weekly walks, creating timestamped Field Notes for completed rooms and sending Field Reports to the general contractor. This supports punch list management, quality assurance, and remote progress monitoring by project managers.
More reported results
Figures published in OpenSpace’s case study. They are not independently measured by usedby.
Over the course of a year-long project, this translates into approximately 26–52 days of repurposed time.
In the customer’s words
OpenSpace has completely changed how we manage projects. Instead of spending time and money fixing issues we couldn’t settle, we now have clear documentation that holds everyone accountable. It’s helped us save time, recover costs, and build stronger trust with our GC and trade partners.OpenSpace users in Construction
Companies in the same sector, with public evidence.
NOVO ConstructionConfirmed
RG ConstructionConfirmedSuffolkConfirmedAxiomaticObserved
Balfour BeattyObserved
Commodore BuildersObservedGo straight to the source
Based on OpenSpace’s published case study. We check the public evidence; the results are reported by the vendor.
openspace.ai- Source published
- Dec 15, 2025
- Last checked
- Nov 8, 2026
Open source capture What the story claims, and what we checked
What we compared with the page.
- The figure: half a dayChecked
Printed word for word on the page, near the name of Valley Interior Systems.
- The passage quoted aboveChecked
Copied word for word from the page, near the name of Valley Interior Systems.
- The publication dateChecked
Read from the page’s own metadata, never guessed.
- Valley Interior Systems uses OpenSpaceChecked
Confirmed line.
- The result itselfNot checked
We quote it; we did not measure it.
The Senior Project Manager at Valley was able to remotely monitor progress in OpenSpace, saving half a day of travel and time at the site each week.
