22 days
“ADT’s average cycle time is 22 days across all request types”
Tal como se publicó en zip.com. Capturado por usedby el 8 oct 2026.
Qué pasó
ADT uses Zip as a single intake and orchestration layer for IT procurement requests. It auto-routes requests by category, spend threshold and complexity, integrates with Ariba, Okta and Ironclad, and tracks contract renewals.
Resumen escrito por usedby a partir de la página de origen, en inglés. Las cifras son de Zip y de ADT, no nuestras.
- $960m“$960m total approved spend in Zip”
ADT’s average cycle time is 22 days across all request types, including complex MSA negotiations. That number has held steady even as the workflow absorbed significant new complexity.
With Zip, everybody knows where to go to create requests for IT purchases. I just send them the link, and everything else is straightforward.
Lo que dice la historia, y lo que verificamos
Comparamos la historia con su página en línea el 8 oct 2026.
- La cifra: 22 daysVerificadoImpresa palabra por palabra en la página, cerca del nombre de ADT.
- El pasaje citado arribaVerificadoCopiado palabra por palabra de la página, cerca del nombre de ADT.
- ADT usa ZipVerificadoLínea de nivel Confirmado. Última verificación entre todas las fuentes: 8 oct 2026.
- El resultado en síNo verificadoLo citamos; no lo medimos.