AI tools for your work
Limited betaChoose an AI tool by starting with the task you want to complete. usedby connects work areas and tasks to tool categories, with public examples to examine.
Your role is not listed? Describe the task you want to do.
Track construction progress
These results show public use in this category. They do not establish use by your profession or suitability for this exact task. Your requirements have not been evaluated.
Category, industry and company size
Company size describes the employer. It does not establish access for a solo practitioner.
Industrial & construction AI
174 companies, 9 tools
About these numbers
Counts cover companies recorded on usedby. They are not market shares. All four proof levels count. Missing size data is excluded only from size-based views. Your requirements have not been evaluated.
Companies with known size: 54%. Vendor companies excluded from this category: 0.

Cognite
24 companies
18 confirmed6 observed
NOVA Chemicals uses Cognite Data Fusion to unify fragmented legacy and siloed operational data into a contextualized single source of truth.
Original source text
The immediate value has already been seen as we focused on one plant when we ingested the data into Cognite and built a relationship between them.
NOVA Chemicals · Read the source 
Neural Concept
19 companies
10 confirmed9 observed
General Motors trained a Neural Concept AI co-pilot on its internal crash simulation data to predict pedestrian safety metrics such as Head Injury Criterion for new vehicle designs, as an alternative to relying only on finite element simulations.
Original source text
In GM’s case, engineers fed NC’s AI co-pilot with internal crash simulation data, spanning 11 vehicle programs, regulatory standards (GTR or NCAP), and more than 100 impact locations per vehicle, for both adults and children.
General Motors · Read the source 
OpenSpace
19 companies
6 confirmed13 observed
NOVO Construction, a general contractor, uses OpenSpace as its standard visual record of jobsites across active projects.
Original source text
Preparing the 10-to-15-page update meant gathering photos, organizing them, matching previous viewpoints, and formatting everything by hand—a process that could consume most of a workday.
NOVO Construction · Read the source























