92%
“reducing its production planning time from two days to just four hours—a 92% reduction”
As published on retool.com. Captured by usedby on Oct 2, 2026.
What happened
Zeus, a manufacturer of advanced polymer components, uses Retool apps and workflows to replace spreadsheets and SharePoint lists with connected internal tools. These include a real-time production scheduling system that draws on its ERP, data lakehouse and SQL databases.
Summary written by usedby from the source page, in English. The figures are those of Retool and Zeus, not ours.
- 15%“The real-time scheduling system improved on-time delivery by 15%”
- 85%“85% reduction in development time (from 2 weeks to 2 days)”
- $83,200“One application alone saved the team approximately $83,200 annually in data wrangling costs.”
- 1,000+“1,000+ weekly active users within three months”
They created a real-time production scheduling system that integrated machine capacity data across facilities, using priority-based algorithms to calculate accurate delivery dates based on equipment availability and order urgency.
We've transformed a nearly impossible manual process that would have taken weeks of collaboration into a streamlined solution that our sales team can easily use. What used to take a week now takes an hour for our sales team. For our customers, that's huge; they don't want to wait.
What the story claims, and what we checked
We compared the story with its live page on Oct 3, 2026.
- The figure: 92%CheckedPrinted word for word on the page, near the name of Zeus.
- The passage quoted aboveCheckedCopied word for word from the page, near the name of Zeus.
- Zeus uses RetoolCheckedConfirmed line. Latest check across sources: Oct 8, 2026.
- The result itselfNot checkedWe quote it; we did not measure it.